The transition from design to prototype represents a critical milestone in any electronic product development cycle. At this juncture, careful component validation can mean the difference between a smooth prototype build and costly rework. As designs grow more complex and supply chains more volatile, this final validation phase is essential.
While your team may have selected components with care during the initial design phase and then refined those selections based on availability data, this final pre-prototype validation ensures that when you commit resources to build your first physical prototype, you're set up for success.
The ideal time to conduct this final validation is after your design has been functionally verified but before you've committed to ordering components. This typically falls after schematic capture, PCB layout, and design rule checking have been completed. At this stage, you have a complete bill of materials (BOM) ready for scrutiny, but your process must remain agile enough to make component substitutions if needed.
Component validation shouldn't happen in isolation. The most successful pre-prototype reviews involve multiple stakeholders:
A systematic approach to pre-prototype validation ensures no critical aspects are overlooked:
One of the most powerful advantages of modern electronics design platforms is their ability to pull in real-time component data from specialized services. Altium's ecosystem provides designers with several integrated data sources for comprehensive validation.
As you approach prototype commitments, Octopart becomes invaluable for verifying actual component availability across multiple suppliers. This is because distributors provide the part data shown in Octopart. Final validation should include:
Both the SiliconExpert integration and Z2Data integration provide powerful risk intelligence tools that are essential for final component validation before committing to prototype builds.
With access to over a billion components and data sourced directly from manufacturers and market research, these integrations offer critical insights for your final validation*:
Lifecycle Analysis
Compliance Verification
Supply Chain Risk Assessment
Advanced Part Alternatives
* Note: Not all parameters listed above are available in both SiliconExpert and Z2Data integrations. Please refer to the respective SiliconExpert and Z2Data product pages for specific parameter availability and capabilities.
While ActiveBOM provides excellent component management during the design phase, transitioning to BOM Portal for final validation offers enhanced capabilities specifically designed for this critical stage.
The BOM Portal dashboard provides a consolidated view of potential issues across your entire bill of materials. During final validation, pay particular attention to:
Components without alternatives represent significant risks to your prototype timeline. Altium 365’s BOM Portal helps identify these vulnerabilities and suggests possible alternatives based on:
Before proceeding to prototype, verify that your design meets all applicable regulatory standards:
BOM Portal provides visibility into inventory distribution across suppliers, helping you:
After thorough validation, you're ready to finalize your BOM and prepare for procurement. This stage focuses on documentation and collaboration to ensure a smooth transition from design to physical prototype.
Document not just primary components but also validated alternatives. For each critical component:
For traceability and future reference, document key supply chain decisions:
The Altium 365 BOM Portal with native Octocart integration simplifies the transition from validated BOM to actual procurement:
The final step before building prototypes involves clear communication between design engineering and procurement teams:
Thorough component validation before the prototype represents the final opportunity to identify and mitigate supply chain risks before committing resources to physical builds. By leveraging the integrated data sources available through Altium's ecosystem—SiliconExpert, Z2Data, Octopart, and BOM Portal—design teams can approach prototype builds with confidence.
Remember that this validation process isn't just about checking availability—it's about comprehensively assessing lifecycle status, compliance requirements, supply chain risks, and sourcing options. A systematic approach to pre-prototype validation will significantly reduce the likelihood of costly rework and timeline extensions.
As you prepare for prototype builds, these final validation steps ensure that your BOM is not just design-ready but truly production-ready—setting the stage for successful prototyping and a smoother transition to full production.